Overview
AG Network Cabling installs security and control panels and builds the control centers that run them, for businesses across California. As a licensed C-10 electrical contractor, we handle the full scope, layout, wiring, and mounting, so your system is installed to code, clean, and built to spec.
Control centers are a specialty of ours. The panel is the hub your security and building systems run through, so how it's wired and laid out determines how easy it is to operate, service, and expand. Our electrical background means the work is done right at the wiring level, not just the surface: organized, labeled, code-compliant, and ready for whoever works on the system next.

What's included
Our core work is security and control panel installation:
Security panels installed, wired, and configured for reliable operation.
Control panels and control centers built to run and monitor your systems from one place.
Free site survey to plan panel placement, access, and wiring routes before any work begins.
We also handle the mounting and finish work that goes with a clean install:
Built-in construction for panels integrated into walls or millwork
Wall mounting with concealed wiring for a professional finish
Ceiling-mounted installations where the layout calls for it
Automated display and TV lifts for control rooms and multi-purpose spaces
Our process
Every project starts with a free on-site survey. We assess where the panel needs to go, how it should be wired, and how it fits the rest of your system, then provide a written quote covering scope, timeline, and cost.
From there, our team handles installation, mounting, and wiring, keeping runs concealed and terminations clean. We test the finished panel and walk you through it, so it's ready to use the day we leave.
Who it's for
The right panel setup depends on how much it has to run. A small office might need a single security panel by the door, while a hotel or multi-site operation needs a full control center tying together surveillance, access, and alarms across every property. We plan the panel around the systems it controls, not a one-size template, for offices, hospitality, commercial facilities, and residential properties alike.
Frequently asked questions
How long does a panel installation take?
It depends on the size and complexity of the system, from a single panel in a day to a phased rollout across multiple properties. You'll get a clear timeline in your written quote before we start.
Can you install a panel in a finished space without tearing up walls?
Yes. We specialize in clean installations with concealed wiring, including wall, ceiling, and built-in mounts designed to minimize disruption to a finished space.
Can you build a full control center with mounted displays?
Yes. Alongside the panels themselves, we handle the mounting and screen work for a complete control center, wired and arranged so your team can monitor everything from one place.
Do I need a separate electrician for the panel wiring?
No. As a licensed C-10 electrical contractor, we handle the electrical work ourselves, so you're not coordinating a separate electrician on top of the install. Panel wiring is done to code by our own licensed team.
Why choose ag network cabling
For over 20 years, businesses across California, including luxury hotels, entertainment venues, and enterprises, have trusted us with their cabling, security, and connectivity.
One accountable teaM
Licensed and insured. A CSLB-licensed low-voltage and electrical contractor (#1076251)
Discretion by default. We're used to working around guests, staff, and high-profile clients without disruption.
Work you could photograph. Clean, labeled, organized installations that are easier to maintain and expand later.
Cost clarity up front. A free assessment and written quote before we start.


