For General Contractors & Construction Managers · Division 26, 27 & 28
General Contractor Bid Desk & Prequalification
One California C-7 and C-10 subcontractor covering Division 26 IT power, Division 27 communications, and Division 28 electronic security—with direct plan-set uploads up to 100 MB and disciplined closeout binders.
CA CSLB #1076251 (C-7 & C-10)One Accountable Team for Power & Low VoltageFree On-Site Survey & Written QuoteVerify Credentials →
CSI MasterFormat Alignment
Combined Division 26, 27 & 28 Scope Coverage
Division 26
Electrical (CA C-10)
- 26 05 26 — Grounding & Bonding for Electrical & Telecom Systems (NEC Art. 250 / TIA-607-E)
- 26 24 16 — Panelboards & Sub-Panels for IT / Server Rooms
- 26 27 26 — Dedicated Locking Receptacles, Rack PDUs & Recessed Display Power
- 26 05 00 — Commercial Tenant-Improvement Branch Circuits & Code Corrections
Division 27
Communications (CA C-7)
- 27 05 28 — Pathways: Ladder Rack, Wire Basket Tray, Fiber Raceway, J-Hooks & UL Firestopping
- 27 11 00 — MDF / IDF Equipment Rooms, Open Racks, Enclosed Cabinets & TIA-606-D Labeling
- 27 13 00 — Optical Fiber & Copper Backbone Cabling (OS2, OM3/OM4/OM5, MPO/MTP, Fusion Splicing)
- 27 15 00 — Horizontal Structured Cabling (Cat6/Cat6A/Cat8, PoE++ 802.3bt, WAP Drops)
- 27 41 00 / 27 51 00 — Audiovisual Systems, Conference Rooms, Sound Masking & Overhead Paging
Division 28
Electronic Safety & Security (CA C-7 / C-10)
- 28 05 00 — Dedicated Security Cabling & Integrator Headend Handoff
- 28 13 00 — Physical Access Control, Electrified Hardware Coordination & Fire-Release Tie-Ins
- 28 23 00 — IP Video Surveillance (CCTV), VMS/NVR & NDAA FY2019 §889 Compliant Sourcing
- 28 31 00 — Fire Alarm Pathways, Device Wiring & Life-Safety Integration (NFPA 72 / 2025 CFC)
Fast-Check Subcontractor Profile
- Legal Entity
- AG Network Cabling Inc
- CSLB License
- #1076251 (C-7 & C-10 · Exp 2027-05-31)
- CSLB License Bond
- $25,000 (American Contractors Indemnity Company)
- Headquarters
- Pico Rivera, CA
- Bid Desk Phone
- (562) 842-4290
Standard Turnover & Closeout Binder
Every commercial, data center, and public-works project closes with clean digital documentation so GCs clear punchlists and release retention without delay:
- 100% pass/fail copper certification (TIA-1152-A) and Tier 1 OLTS / Tier 2 OTDR fiber reports
- ANSI/TIA-606-D machine-printed port schedules, panel directories, and splice tray maps
- Redline as-built floor plans, rack elevations, and equipment O&M manuals
- NDAA §889 / TAA manufacturer compliance declarations (when specified)
- Walkthrough sign-off and owner/facilities staff training
CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical
Add AG Network Cabling to your Division 26, 27 & 28 bid list
Send your Invitation to Bid, link to your plan room, or upload PDF/DWG/ZIP drawings directly.