Skip to main content
AG Network Cabling

Industry Practice · Education

Education: K-12, Community Colleges & Universities

DSA-aware campus cabling, classroom AV, fiber backbones, and access control for schools.

CA CSLB #1076251 (C-7 & C-10)One Accountable Team for Power & Low VoltageFree On-Site Survey & Written QuoteVerify Credentials →

At a Glance

AG Network Cabling delivers campus fiber backbones, TIA-4966 structured cabling, classroom AV, overhead paging, IP surveillance, and access control for California K-12 school districts, community colleges, and universities. Licensed under CA CSLB #1076251 (C-7 and C-10), we execute summer-break modernization schedules cleanly alongside DSA Inspectors of Record.

EDUCATION · INFRASTRUCTURE SCHEMATICCA CSLB #1076251 · C-7 & C-10
CORE-ALIGNMENT FUSION SPLICING · TIER 1 OLTS & TIER 2 OTDR TRACESPLICE LOSS < 0.05 dB TYPICAL0m LAUNCHSPLICE EVENT VERIFIEDPASS · TIA-526-7 / 526-14
Unified C-7 low-voltage and C-10 electrical architecture for Education: K-12, Community Colleges & Universities

Operational Challenges We Solve

  • Compressed summer-break construction windows that must finish before teachers return in August.
  • Division of the State Architect (DSA) documentation, firestopping, and Inspector of Record sign-off requirements.
  • Aging multi-building campus fiber backbones and classroom AV that teachers struggle to operate.

Compliance & Standards Context

DSA (Division of the State Architect)
California public K-12 and community college structural, fire/life-safety, and accessibility oversight.
ANSI/TIA-4966-A
Educational facility cabling architecture for high-density classroom Wi-Fi and AV.
CA Labor Code §1720–§1777.5
Prevailing wage, DIR eCPR, and Skilled & Trained Workforce (PCC §2600) rules on public school construction.
FCC E-Rate (USAC)
Category 2 internal connections eligibility framework (confirm provider SPIN before bidding E-Rate).

Typical Project Phases

  1. 1. Pre-Summer Submittals & Staging

    Approve cut sheets and stage materials ahead of the last day of school.

  2. 2. Accelerated Break Execution

    Deploy crews across classrooms, IDFs, and campus fiber pathways during break windows.

  3. 3. IOR Walkthrough & Teacher Readiness

    Complete DSA inspection punchlists, certify every drop, and commission classroom AV before opening day.

Occupied-Facility & Phasing Protocol

During the school year, work is scheduled after school hours or on weekends with strict campus check-in, clean tool security, and zero classroom disruption.

Frequently Asked Questions

Can AG work on California public K-12 and community college DSA projects?

Yes. We coordinate installations, UL-listed firestopping, ADA assistive listening, and testing directly with general contractors and DSA Inspectors of Record.

Can you complete multi-classroom cabling and AV upgrades over summer break?

Yes. By completing submittals and material procurement before school lets out, we execute multi-building installations cleanly within tight summer schedules.

Do you handle campus fiber backbones between separate school buildings?

Yes. We pull, fusion-splice, and OLTS/OTDR-test indoor/outdoor OS2 and OM4 fiber backbones linking campus MDF and IDF closets.

CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical

Ready to scope your project or send plans?

Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.