Skip to main content
AG Network Cabling
Programs & Lifecycle

Prevailing Wage & Public Works Projects

Disciplined C-7 low-voltage and C-10 electrical execution built for California public works and federal subcontracting.

CA CSLB #1076251 (C-7 & C-10)One Accountable Team for Power & Low VoltageFree On-Site Survey & Written QuoteVerify Credentials →

At a Glance

AG Network Cabling supports California municipal, county, school district, special district, and federal construction programs under CSLB License #1076251 (C-7 and C-10). We structure estimating, document control, submittals, and closeout packages around California Labor Code §1720–§1777.5 and federal Davis-Bacon requirements. Send your bid invitation or plans directly through our Bid Invitations page.

PROGRAMS & LIFECYCLE · SYSTEM ARCHITECTURECA CSLB #1076251 · C-7 & C-10
/01SURVEY & ITBCSI Div 26/27/28/02SUBMITTALSNDAA / Cut Sheets/03C-7 + C-10 BUILDPrevailing Wage / MOP/04TURNOVERTests + As-BuiltsONE ACCOUNTABLE TEAM · FREE ON-SITE SURVEY · DOCUMENTED CLOSEOUT
Typical AG Network Cabling topology for Prevailing Wage & Public Works Projects (CA Labor Code §1720–§1777.5)

Why Buyers Choose Disciplined Execution

Public works general contractors and contracting officers cannot afford subcontractors who treat certified payroll, apprenticeship rules, or submittal schedules as paperwork afterthoughts. Missing DIR compliance or non-compliant hardware (such as NDAA §889 violations) stalls progress payments and delays project closeout.

We organize public-sector bids around transparent scopes, accurate code compliance, and complete closeout documentation from day one.

Scope We Deliver

California Public Works Compliance Support

01
  • Project support aligned with California Labor Code §1720 (public works definition) and §1771 (prevailing wages)
  • Electronic certified payroll (DIR eCPR) workflow readiness under Labor Code §1776
  • Apprenticeship ratio coordination under Labor Code §1777.5 and Skilled & Trained Workforce (PCC §2600) awareness where applicable

Federal Subcontracting & Compliance Support

02
  • Support for Davis-Bacon and Related Acts (29 CFR Parts 1, 3, 5) and WH-347 weekly certified payroll
  • NDAA FY2019 §889 prohibited-equipment compliance and TAA / BABA product-sourcing verification
  • Coordination with prime general contractors on Miller Act bonding thresholds (FAR 28.102-1, >$150,000)

Covered Public-Sector Trades

03
  • Structured cabling, fiber backbones, C-10 electrical circuits, access control, CCTV, AV, and paging
  • City halls, police/fire stations, libraries, water/wastewater facilities, K-12 schools (DSA), and federal buildings

How It Works: Survey to Turnover

  1. 1. On-Site Survey & Analysis

    PHASE 01

    We walk the facility, review room acoustics, lighting, mounting structure, or existing infrastructure, and issue a written scope and quote.

    Site survey checklistWritten scope, timeline & quote
  2. 2. Pre-Construction & Submittals

    PHASE 02

    We prepare cut sheets, equipment schedules, and pathway coordination with the general contractor and IT/facilities team.

    Submittals & cut sheetsRFI responsesRack/room elevations
  3. 3. Procurement & Staging

    PHASE 03

    Hardware and cabling are sourced per spec (including NDAA §889 compliance where required) and staged cleanly for site delivery.

    BOM verificationPre-configuration / staging log
  4. 4. Installation & Dressing

    PHASE 04

    Concealed wiring, clean mounts, and Velcro-dressed equipment racks keep both public rooms and back-of-house closets organized.

    Daily progress logsIn-progress quality inspection
  5. 5. Testing & Commissioning

    PHASE 05

    Every endpoint, audio zone, camera stream, or phone extension is commissioned and verified under real operating conditions.

    Commissioning test reportPunchlist verification
  6. 6. Documentation & Closeout

    PHASE 06

    We deliver TIA-606-D labels, as-built drawings, O&M manuals, and hands-on administrator or end-user training.

    As-builts & port mapsO&M manualsOwner training sign-off
  7. 7. Ongoing Support

    PHASE 07

    Post-installation troubleshooting, moves/adds/changes, and scheduled maintenance keep systems reliable long after turnover.

    Service ticketsUpdated documentation

Applicable Standards & Codes

Standard / CodeWhat It Governs
CA Labor Code §1720–§1777.5California public works definition, DIR registration (§1725.5), prevailing wages, eCPR (§1776), and apprentices
CA Public Contract Code §2600 et seq.Skilled and Trained Workforce requirements where applicable on public contracts
Davis-Bacon Act (29 CFR Parts 1, 3, 5)Federal prevailing wage rates and WH-347 certified payroll reporting
Miller Act (FAR 28.102-1)Performance and payment bonds on federal construction contracts exceeding $150,000
NDAA FY2019 §889 & BABAFederal prohibited telecom/video equipment and Build America, Buy America domestic content rules

Deliverables at Turnover

  • Detailed scope breakdown aligned to CSI Division 26 (Electrical), Division 27 (Communications), and Division 28 (Electronic Safety & Security)
  • Complete submittals, cut sheets, NDAA/country-of-origin declarations, and RFI tracking
  • Certified test reports, TIA-606-D labels, as-builts, and O&M closeout binders

Testing & Verification

All public-sector installations undergo full specification-compliant testing and Inspector of Record (IOR) or AHJ witness walk-throughs.

Warranty & Licensing

Standard public-works workmanship warranty and manufacturer warranty packages are provided per contract specifications.

Applicable License: California CSLB #1076251 (C-7 & C-10)

How This Scope Adapts by Industry

City, county, special district, and public safety projects across Southern California and statewide.

Why AG Network Cabling

Single accountable contractor for C-7 low voltage and C-10 electrical.
Clean, Velcro-dressed, ANSI/TIA-606-D labeled infrastructure.
Discreet execution in occupied offices, luxury hotels, clinics, and data halls.
Direct access to accountable owners and a free on-site survey before work begins.

Related Services

Frequently Asked Questions

What should a general contractor send with a public-works bid invitation?

Send the Division 26/27/28 drawings and specifications, addenda, bid due date/time, project location, applicable wage determination (CA DIR or federal Davis-Bacon), and any Skilled & Trained Workforce or PLA requirements via our Bid Invitations page.

Does AG hold both C-7 and C-10 California licenses for Division 26/27/28 scopes?

Yes. AG Network Cabling Inc holds active California CSLB License #1076251 for both C-7 (Low Voltage Systems) and C-10 (Electrical).

How do I verify AG's current DIR, SAM.gov, bonding, and insurance credentials for prequalification?

Visit our Certifications & Licenses page or Government Contracting hub for live verification links and our Capability Statement, or request a current prequalification packet through our RFQ form.

Do you handle NDAA Section 889 compliant security equipment for government buildings?

Yes. We source NDAA FY2019 §889 compliant cameras, recorders, and network hardware and provide manufacturer compliance documentation in submittals.

Can AG work on California K-12 and community college DSA projects?

Yes. We coordinate installations, pathway firestopping, and inspection sign-offs with general contractors and DSA Inspectors of Record (IORs).

CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical

Ready to scope your project or send plans?

Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.