Skip to main content
AG Network Cabling
Security & Life Safety

Access Control & Door Security Systems

Reliable card, mobile, and keypad access control with code-compliant egress, fire-alarm release, and neat control panels.

CA CSLB #1076251 (C-7 & C-10)One Accountable Team for Power & Low VoltageFree On-Site Survey & Written QuoteVerify Credentials →

At a Glance

AG Network Cabling installs commercial access control and door security systems—including card and mobile readers, controllers, electric strikes, maglocks, request-to-exit (REX) sensors, video intercoms, and gate entry—across Southern California and multi-site commercial accounts. Holding CA CSLB #1076251 (C-7 and C-10), we coordinate electrified door hardware, ADA/CBC 11B egress, and fire-alarm release interfaces cleanly.

SECURITY & LIFE SAFETY · SYSTEM ARCHITECTURECA CSLB #1076251 · C-7 & C-10
SECURITY HEADENDVMS / NVR · ACCESS CTRLHARDENED CAMERA VLANNDAA §889 · UL 294IP DOME / PTZ / LPRONVIF · SHIELDED PoEFIRE ALARM RELEASENFPA 101 FAIL-SAFECARD / MOBILE / PIVFICAM / CBC 11B HEIGHTSTRIKE / MAGLOCK / REXCOMPOSITE DOOR CABLE
Typical AG Network Cabling topology for Access Control & Door Security Systems (UL 294)

Why Buyers Choose Disciplined Execution

Access control failures usually happen at the intersection of four trades: door hardware, low-voltage wiring, electrical power, and fire-alarm release. Miswired maglocks fail fire marshal inspection; messy control panels make troubleshooting a locked door slow and expensive.

We install clean, well-labeled control enclosures and coordinate directly with door-hardware suppliers and life-safety contractors so every controlled opening passes inspection on the first walk.

Scope We Deliver

Credentials, Readers & Controllers

01
  • Proximity, smart card (DESFire/SEOS), mobile credential, keypad, and biometric readers
  • Cloud-managed and on-premises access control panels and network door controllers
  • Video door phones, visitor entry intercoms, and vehicle gate entry integration

Electrified Hardware & Egress

02
  • Electric strikes, electromagnetic locks (maglocks), and electrified mortise/cylindrical locksets
  • Request-to-exit (REX) motion sensors, push-to-exit buttons, and door position switches
  • Coordination with Division 8 door hardware suppliers for frame prep and power-transfer hinges

Life Safety, ADA & Integration

03
  • Fail-safe fire alarm release interfaces for maglocks and delayed-egress hardware per NFPA 101 and CBC
  • ADA / California Building Code Chapter 11B reader mounting height and clearance compliance
  • Integration with IP video surveillance for badge-event camera bookmarking

How It Works: Survey to Turnover

  1. 1. On-Site Survey & Analysis

    PHASE 01

    We walk the facility, inspect existing pathways, closets, and electrical capacity, and clarify schedule or occupancy constraints before pricing.

    Site survey notesPathway & closet assessmentWritten scope and quote
  2. 2. Pre-Construction & Submittals

    PHASE 02

    We prepare product cut sheets, coordinate RFIs with the general contractor or IT lead, and align pathway routing with other trades.

    Product submittals & cut sheetsRFI responsesShop drawings / port schedules
  3. 3. Procurement & Staging

    PHASE 03

    Materials are ordered to specification, staged cleanly, and verified against jobsite delivery windows and security protocols.

    Bill of materials verificationDelivery & staging schedule
  4. 4. Installation & Dressing

    PHASE 04

    Field installation follows NEC, California Electrical Code, and TIA pathway rules with Velcro-dressed bundles and clear trade separation.

    Daily progress logsIn-progress quality checks
  5. 5. Testing & Commissioning

    PHASE 05

    Every drop, fiber strand, circuit, or device is verified against applicable TIA, IEEE, or NFPA performance limits before turnover.

    Certification test reportsCommissioning & punchlist sign-off
  6. 6. Documentation & Closeout

    PHASE 06

    We label infrastructure to ANSI/TIA-606-D conventions and hand over complete digital closeout packages for your facilities and IT teams.

    TIA-606 labeling scheduleRedline as-builtsO&M manuals & owner training
  7. 7. Ongoing Support

    PHASE 07

    Post-turnover moves, adds, changes (MACs), troubleshooting, and preventive maintenance keep systems documented as your facility evolves.

    Updated port mapsService tickets & maintenance records

Applicable Standards & Codes

Standard / CodeWhat It Governs
UL 294Access control system units, fail-safe/fail-secure operation, and electrical safety
NFPA 101 & 2025 CBCMeans of egress, maglock release, and delayed-egress hardware rules
ADA 2010 / CBC Chapter 11BAccessible reader heights, clearances, and door-operating hardware
FICAM / FIPS 201-3 / GSA APLFederal PIV smart-card readers and approved PACS hardware (for federal facilities)

Deliverables at Turnover

  • Neatly dressed, labeled access control enclosures with power backup testing
  • Door-by-door functional and fire-release test checklist
  • As-built door schedule, wiring diagrams, and administrator handoff training

Testing & Verification

Every door is tested for credential read, latch release, REX trigger, forced/held-open alarm, battery failover, and fire-alarm release drop before turnover.

Warranty & Licensing

Workmanship warranty terms and hardware manufacturer warranties are documented in your written proposal.

Applicable License: California CSLB #1076251 (C-7 & C-10)

How This Scope Adapts by Industry

Mantrap interlocking, cage card/biometric access, and full audit-trail logging.

Why AG Network Cabling

Single accountable contractor for C-7 low voltage and C-10 electrical.
Clean, Velcro-dressed, ANSI/TIA-606-D labeled infrastructure.
Discreet execution in occupied offices, luxury hotels, clinics, and data halls.
Direct access to accountable owners and a free on-site survey before work begins.

Related Services

Frequently Asked Questions

How do you handle fire alarm release for electromagnetic locks (maglocks)?

Maglocks on egress doors require a fail-safe tie-in to the building fire alarm system plus listed local release hardware (REX sensor and push-to-exit button) per NFPA 101 and the California Building Code. We coordinate the relay interface and test drop-out with the fire alarm contractor.

Do you install both cloud-managed and on-premises access control systems?

Yes. We install infrastructure and hardware for both cloud-managed platforms and on-premises enterprise servers, matched to your IT security and multi-site administration needs.

What licensing applies to access control in California?

Low-voltage access control wiring falls under CSLB C-7 (and line-voltage power under C-10). Certain integrated alarm/monitoring scopes may also require a California BSIS Alarm Company Operator (ACO) license; we verify scope and licensing requirements during pre-construction.

Can you integrate access control with our IP video surveillance system?

Yes. Integrating access events with your VMS allows security staff to jump directly to video clips triggered by badge reads, forced doors, or denied access attempts.

Do you support federal PIV / FICAM access control hardware?

We can install cabling and GSA APL-listed readers and controllers specified for federal PIV/FICAM environments when required by project specifications.

CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical

Ready to scope your project or send plans?

Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.